Design and Build of Out-Gate Lane Modification Works at CT8W for Asia Container Terminals Ltd.

Contract No.:

Client:

Construction Period:

Area:

C1653

Asia Container Terminals Ltd.

3/04-5/04

N/A

Contract No.:

C1653

Client:

Asia Container Terminals Ltd.

Construction Period:

3/04-5/04

Area:

N/A

Design and Build of Out-Gate Lane Modification Works at CT8W for Asia Container Terminals Ltd.

Tags

What do you think?