Projects
Building the future of the construction industry, one project at a time.
Replacement of Windproof Baffle Ceiling at Podium Level 2 and Suspended Ceiling at Podium Level 2 Lobby of Block 3 in Bo Shek Mansion (20002/BSM) (B/20200216/BSM)
Contract No.: B/20200216/BSM
Client: Hong Kong Housing Society
Construction Period: Nov-22 – Dec-25
Area: N/A
Replacement of Windproof Baffle Ceiling at Podium Level 2 and Suspended Ceiling at Podium Level 2 Lobby of Block 3 in Bo Shek Mansion (20002/BSM) (B/20200216/BSM)
Contract No.: B/20200216/BSM
Client: Hong Kong Housing Society
Construction Period: Nov-22 – Dec-25
Area: N/A
Re-instatement works for 3B Male & 4A Male and Female Lavatory at 3-4/F, EMSD HQ
Contract No.: PO No. 4200510519, PO No. 4200510520
Client: Electrical and Mechanical Services Department
Construction Period: Feb-26 – Apr-26
Contract No. TC PM031 Education Bureau Term Maintenance Contract at Wong Tai Sin, Kwun Tong and Sai Kung (2026-2028)
Contract No.: TC PM031
Client: Education Bureau
Construction Period: Jan-26 – Dec-28
Area: N/A
Contract No. TC PM031 Education Bureau Term Maintenance Contract at Sham Shui Po, Tsuen Wan and Kwai Tsing (2026-2028)
Contract No.: TC PM021
Client: Education Bureau
Construction Period: Jan-26 – Dec-28
Area: N/A

Contract No. T25W021 Enhancement Works in L5 Arrivals Immigration Area of Terminal 1
Contract No.: T25W021
Client: Airport Authority Hong Kong
Construction Period: Feb-25 – Apr-28
Area: Approx. 2,100 m2

Contract No. T25S035 Provision of New Luxury Concierge in Unit 5E592 of Terminal 1
Contract No.: T25S035
Client: Airport Authority Hong Kong
Construction Period: Feb-25 – Mar-26
Area: Approx. 28 m2

Establishment of The EDUHK Clinical Education Centre for the Education University of Hong Kong
Contract No.: T006-25
Client: The Education University of Hong Kong
Construction Period: Dec-25 – Mar-26
Area: 265m2

Contract No. TC P928 ArchSD Term Maintenance Contract for Slopes at Hong Kong Island and Outlying Islands (South) (2025-2029)
Contract No.: TC P928
Client: Architectural Services Department
Construction Period: Ocb-25 – Sep-29
Area: Approx. 8m2 + 28m2 = 36 m2

Contract No. TC N921 ArchSD Term Maintenance Contract at Wan Chai (South) and Wan Chai (North) (2025-2029)
Contract No.: TC N921
Client: Architectural Services Department
Construction Period: Apr-25 – Mar-29
Area: N/A

Contract No. TC N952 ArchSD Term Maintenance Contract at Tai Po, North District and Outlying Islands (North) (2025-2029)
Contract No.: TC N952
Client: Architectural Services Department
Construction Period: Apr-25 – Mar-29
Area: N/A

Hospital Authority Term Contract for Minor Works 2024 for Hong Kong West Cluster (HA-TMC-044)
Contract No.: HA-TMC-044
Client: Hong Kong Hospital Authority
Construction Period: Jan-25 – Dec-27
Area: N/A

HKIA Term Maintenance Contract T24M101 for Buildings and Hydraulic Systems at Terminal 1 and Associated Buildings
Contract No.: T24M101
Client: Airport Authority Hong Kong
Construction Period: Jan-25 – Mar-30
Area: Approx. 864,045 m2
CPPS B1 Flur Duct Supporting Frame Structural Works (Ban at CLP’s Premises)
Contract No.: PO No. 4200510519, PO No. 4200510520
Client: Electrical and Mechanical Services Department
Construction Period: Feb-26 – Apr-26
Area: Approx. 8m2 + 28m2 = 36 m2

Hong Kong International Airport Three Runway System Project Contract 3804 – East and Landside Fire Stations
Contract No.: 3804
Client: Thewsa Sand Blast Engineering. Co. Ltd
Construction Period: Nov-22 – Dec-25
Area: N/A

Replacement of Windproof Baffle Ceiling at Podium Level 2 and Suspended Ceiling at Podium Level 2 Lobby of Block 3 in Bo Shek Mansion (20002/BSM) (B/20200216/BSM)
Contract No.: B/20200216/BSM
Client: Hong Kong Housing Society
Construction Period: Nov-22 – Dec-25
Area: N/A

Main Contract for Proposed Commercial Centre Extension at 9A, Discovery Bay, Lantau Island, N.T.
Contract No.: B/20200216/BSM
Client: HKR International Limited
Construction Period: Feb-17 – Jun-20
Area: N/A

Contract No. CON050521T-R Ocean Park BoH – Renovation Works at G/F Coral Building for Interim Offices of Top Level Management
Contract No.: CON050521T-R
Client: Ocean Park Corporation
Construction Period: 10/13 – 1/14
Area: N/A

Interior Renovation and Fitting Out Works to G/F Lobbies and Typical Lobbies for Perth Apartments No. 27-31 Perth Street, Ho Man Tin, Kowloon
Contract No.: N/A
Client: I.O. of Perth Apartments
Construction Period: 8/13 – 3/14
Area: N/A

CON054301T Water Intake Chamber, Ocean Park – Design and Build for Structural Support, Concrete Repairing and other Miscellaneous Works
Contract No.: CON054301T
Client: Ocean Park Corporation
Construction Period: 7/13 – 8/13
Area: N/A

Term Contract for Refurbishment of Vacant Flats at Phase 2 of Kwun Lung Lau (2013-2014) (B/20130035/KLL)
Contract No.: B/20130035/KLL
Client: Hong Kong Housing Society
Construction Period: 6/13 – 12/13
Area: N/A

Renovation Works for Spatial Reorganisation at David C Lam Building and Wing Lung Bank Building for HKBU, Kowloon Tong
Contract No.: N/A
Client: Hong Kong Baptist University
Construction Period: 4/13 – 7/13
Area: N/A

Renovation Works to External Walls at Melbourne Plaza, 33 Queen’s Road Central, Hong Kong
Contract No.: N/A
Client: Melbourne Enterprises Limited
Construction Period: 1/13 – 3/14
Area: N/A

Proposed Industrial Development at 313-317 Castle Peak Road, Kwai Chung – D.D. 445 Lot 693 s.E.
Contract No.: N/A
Client: Bright Port Holdings Limited
Construction Period: 12/12 – 3/14
Area: N/A

External Renovation Works to Perth Apartments, 31 Perth Street, Homantin, Kowloon
Contract No.: PSI/AP/LT/Q100/2011/092/C2
Client: I.O. of Perth Apartments
Construction Period: 9/12-10/13
Area: N/A

Slope Upgrading Works for Retaining Wall at Junk Bay Chinese Permanent Cemetery – Lot No. JBTL3
Contract No.: N/A
Client: The Board of Management of The Chinese Permanent Cemeteries
Construction Period: 9/12 – 4/13
Area: N/A

Giant Panda Adventure, Waterfront, Ocean Park – Enhancement Works for Turtle Pond, Otter House, Giant Panda Exhibit & Flight Exercise Aviary
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 8/12 – 10/12
Area: N/A

Alteration and Addition Works of Chinese Restaurant at 3/F Tin Chak Shopping Centre, N.T.
Contract No.: 12-012713
Client: The Link Management Limited
Construction Period: 7/12 – 12/12
Area: N/A

Site Formation, Access Road, Plant Rooms and Foundation for Proposed Garden Houses at Area 1A/B Discovery Bay, Lantau Island, N.T.
Contract No.: N/A
Client: Hong Kong Resort Co., Limited
Construction Period: 7/12 – 8/13
Area: N/A

Reinstatement Works for Harbour Grand Hong Kong at 23 Oil Street, North Point, Hong Kong (After the Fire)
Contract No.: CK228HK97
Client: Harbour Grand Hong Kong Limited
Construction Period: 7/12 – 12/13
Area: N/A

Main Contract for Proposed A&A Works for Maxim’s New Food Factory Development at No. 5 Dai Shun Street, Tai Po Industrial Estate, Tai Po, N.T.
Contract No.: N/A
Client: Luk Yeung Restarurant Ltd
Construction Period: 6/12 – 8/13
Area: N/A

Renovation Works of Annex Building, Lee Wai Lee Campus for HKBU at Kowloon Tong, Kowloon
Contract No.: N/A
Client: Hong Kong Baptist University
Construction Period: 6/12 – 8/12
Area: N/A

Proposed Office Development at 135-137 Hoi Bun Road, Kwun Tong, Kowloon
Contract No.: N/A
Client: Vital Success Development Limited
Construction Period: 5/12 – 5/13
Area: N/A

A&A Works to Chinese Restaurant Block at Tai Hing Estate, Tuen Mun, N.T.
Contract No.: 11-008447
Client: The Link Management Limited
Construction Period: 3/12 – 12/12
Area: N/A

Structural Conversion of a 23-storey Residential Building to Hotel at 31-33 King’s Road, Hong Kong
Contract No.: N/A
Client: Far Talent Limited
Construction Period: 9/11 – 12/11
Area: N/A

Management of ELS, Piling and Foundation Works for the Redevelopment of Proposed Commercial Building at 133-135 Hoi Bun Road, Kwun Tong, Kowloon
Contract No.: N/A
Client: Vital Success Development Limited
Construction Period: 9/11 – 4/12
Area: N/A

Main Contract for Proposed A&A Works for Nin Jiom Medicine Manufacturing factory at 50 Wang Lee Street, Yuen Long Industrial Estate, N.T.
Contract No.: N/A
Client: Nin Jiom Medicine Mfy. (HK) Ltd.
Construction Period: 5/11 – 6/12
Area: N/A

Proposed Residential Building at 32 Sands Street, Kennedy Town, Hong Kong
Contract No.: N/A
Client: Far Talent Limited
Construction Period: 11/10 – 4/12
Area: N/A

Removal of Hoist and Concrete Fins in the Hoist-way at Tsuen Wan Industrial Centre, 220-248 Texaco Road, Tsuen Wan, Hong Kong
Contract No.: N/A
Client: Savills Property Management Ltd.
Construction Period: 10/10 – 2/11
Area: N/A

Structure Improvement Works at Training Yard and Ocean Theatre, Back of House Area, Ocean Park
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 10/10 – 11/10
Area: N/A

Refurbishment of External Walls and Screen Wall for Block B, Fairview Park, Yuen Long, N.T.
Contract No.: N/A
Client: Fairview Park Country Club
Construction Period: 10/10 – 12/10
Area: N/A

Renovation Works to Man Mo Temple, Litt Shing Kung and Virtue Court
Contract No.: N/A
Client: Tung Wah Group of Hospitals
Construction Period: 9/10 – 11/10
Area: N/A

Supply and Installation of Stainless Steel Trough at HKCC Green Bowl Lawn
Contract No.: N/A
Client: The Hong Kong Cricket Club
Construction Period: 7/2010
Area: N/A

Replacement of Existing Air Conditioning System with New Daikin VRV System for House 6, The Belvedere, 51-61 Plantation Road, the Peak, Hong Kong
Contract No.: N/A
Client: Linfield Limited
Construction Period: 7/10 – 9/10
Area: N/A

Provision of Remedial Work for Radio Tower at North of Tunnel 5A
Contract No.: N/A
Client: MTR Corporation Ltd.
Construction Period: 6/10 – 9/10
Area: N/A

Improvement Works at Suite 5B, Block 3, Grandeur Villa, 21 Tat Chee Avenue, Kowloon Tong, Kowloon
Contract No.: N/A
Client: Ms. Wong Yuk Sen Anna
Construction Period: 5/10 – 8/10
Area: N/A

Comprehensive Refurbishment Works for Flat 2, 27/F., Block C, Imperial Court, 62G Conduit Road, Hong Kong
Contract No.: N/A
Client: Ms. Chan Lai Ka
Construction Period: 4/10 – 8/10
Area: N/A

Urgent Repair Works to G/F Mortuary Hall International Funeral Parlour
Contract No.: N/A
Client: Tung Wah Group of Hospitals
Construction Period: 12/09 – 1/10
Area: N/A

Comprehensive Re-furbishment Works at House A26, Regalia Bay, Stanley, Hong Kong
Contract No.: N/A
Client: Splendid China (HK) Ltd.
Construction Period: 11/09 -6/10
Area: N/A

Comprehensive Re-furbishment Works for Wong’s Family at Suite A, 16/F., 3 Repulse Bay Road, Hong Kong
Contract No.: N/A
Client: Techwall Electronic Instruments Co., Ltd.
Construction Period: 11/09 -5/10
Area: N/A

External Wall Repairs at Luk Yeung Galleria
Contract No.: N/A
Client: MTR Corporation Ltd.
Construction Period: 11/09 – 12/09
Area: N/A

P.O. No. 1027064 – Refurbishment of Acid Washing Plant in Chai Wan Depot
Contract No.: N/A
Client: MTR Corporation Ltd.
Construction Period: 11/09 -12/09
Area: N/A

Comprehensive Re-furbishment Works for Chu’s Family at G/F., 212 Victoria Road, Pokfulam, Hong Kong
Contract No.: N/A
Client: Chase Goal Co., Ltd.
Construction Period: 10/09 – 5/10
Area: N/A

Contract No. K0562-09C – Enhancement Works at Tai Po Market Station
Contract No.: K0562-09C
Client: MTR Corporation Ltd.
Construction Period: 10/09 – 7/10
Area: N/A

External Façade Upgrading Work at Giant Panda Habitat, Lowland
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 8/09 – 3/10
Area: N/A

Term Contract for Repair of Plumbing and Drainage System in Cho Yiu Chuen (2009/2010)(B/20090115/CYC)
Contract No.: B/20090115/CYC
Client: Hong Kong Housing Society
Construction Period: 8/09 – 8/10
Area: N/A

Term Contract for Replacement of Toilet Door at Ming Wah Dai Ha (B/20090171)
Contract No.: B/20090171
Client: Hong Kong Housing Society
Construction Period: 8/09 – 8/10
Area: N/A

Supply and Install Fire Rated Doors in OCC Tsing Yi Station
Contract No.: N/A
Client: MTR Corporation Ltd.
Construction Period: 8/09 – 12/09
Area: N/A

Conversion Works to Tin Hau Temple Complex
Contract No.: N/A
Client: Tung Wah Group of Hospitals
Construction Period: 8/2009
Area: N/A

Comprehensive Re-furbishment Works at Suite F11, The Grenville, Mid-Levels, Hong Kong
Contract No.: N/A
Client: Keymark Investment Ltd.
Construction Period: 7/09 – 1/10
Area: N/A

Comprehensive Re-furbishment Works for Chan Family at 25A, Tavistock II, Hong Kong
Contract No.: N/A
Client: Dr. Chan Wai Fan
Construction Period: 6/09 -9/09
Area: N/A

Additional Steel Staircase and Associated Works for 33/F to 35/F., The Albany, 1 Albany Road, Hong Kong
Contract No.: N/A
Client: Esther & Victor Limited
Construction Period: 4/09 – 7/09
Area: N/A

Comprehensive Re-furbishment Works for Lai’s Family at House B, No.71 Mount Kellett Road, the Peak, Hong Kong
Contract No.: N/A
Client: Mr.& Mrs. Lai
Construction Period: 3/09 – 9/09
Area: N/A

Upgrading the Floor Surface for Kid’s World, Lowland, Ocean Park
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 3/09 – 6/09
Area: N/A

P.O. No. 1018800 – Replacement of Chain Link Fence and Doors in Chai Wan Depot
Contract No.: P.O. No. 1018800
Client: MTR Corporation Ltd.
Construction Period: 2/09-5/09
Area: N/A

Replacement of Tunnel Line Sump Platform in Tsuen Wan Line located near Admiralty Station and near Kwai Hing Station
Contract No.: N/A
Client: MTR Corporation Ltd.
Construction Period: 11/08 – 4/09
Area: N/A

Installation of Metal Cladding and Fall Arrest System in Ocean Walk
Contract No.: N/A
Client: MTR Corporation Ltd.
Construction Period: 11/08 -3/09
Area: N/A

Contract No. CY009-08C – Station Commercial Works for Kowloon Tong Station
Contract No.: CY009-08C
Client: MTR Corporation Ltd.
Construction Period: 10/08 – 5/09
Area: N/A

Contract No. K8032-08C – Operation and Maintenance Enhancement Works for LMC Terminus
Contract No.: K8032-08C
Client: MTR Corporation Ltd.
Construction Period: 10/08 – 3/09
Area: N/A

Spectator Area for Tennis Courts 1-6 Block F-2, Fairview Park Country Club
Contract No.: N/A
Client: Fairview Park Country Club
Construction Period: 10/08 – 12/08
Area: N/A

Fitting out Works to Transfer Lift Tower & Podium Entrance Lobbies for The Pinnacle, 8 Wan Hang Road, Tseung Kwan O, N.T.
Contract No.: N/A
Client: Hong Kong Housing Society
Construction Period: 9/08-7/09
Area: N/A

A&A Works at Main Block and Miller Hall at Tsuen Wan Adventist Hospital, 199 Tsuen King Circuit, Tsuen Wan, Kowloon
Contract No.: N/A
Client: Seventh-day Adventist Corporation (HK) Ltd.
Construction Period: 9/08-12/08
Area: N/A

Contract No. K0121-08C Pat Heung Depot Maintenance Pit Extension and Miscellaneous Improvements at MTR Premises
Contract No.: K0121-08C
Client: MTR Corporation Ltd.
Construction Period: 9/08 – 5/09
Area: N/A

Renovation Works for Caritas Integrated Family Service Centre – Tung Tau at G/F., Unit 10-16, Wing Tung House, Tung Tau Estate, Kowloon
Contract No.: N/A
Client: Caritas – Hong Kong
Construction Period: 9/08-10/08
Area: N/A

Comprehensive Refurbishment Works at Flat A, 26/F., Tower 5, the Sorrento, Tsimshatsui, Kowloon
Contract No.: N/A
Client: Mr. Law & Ms. Wong
Construction Period: 8/08-10/08
Area: N/A

Design and Build for Additional Theme Works at Ocean Theatre, Headland, Ocean Park
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 7/08 – 9/08
Area: N/A

Comprehensive Refurbishment for Gillian & Peter’s New Apartment in King Kwong Street, Happy Valley, Hong Kong
Contract No.: N/A
Client: Mr. Peter R. Callaghan
Construction Period: 7/08-9/08
Area: N/A

Security Enhancement Works at MTR Sheung Shui Station
Contract No.: N/A
Client: MTR Corporation Ltd.
Construction Period: 6/08-10/08
Area: N/A

Tennis Courts Resurfacing Works for Fairview Park Country Club
Contract No.: N/A
Client: Fairview Park Country Club
Construction Period: 6/08 – 8/08
Area: N/A

Comprehensive Re-furbishment Works at House 5, the Belvedere, 61 Plantation Road, the Peak, Hong Kong
Contract No.: N/A
Client: Linfield Limited
Construction Period: 5/08 – 10/08
Area: N/A

Installation of Stainless Steel Letter Boxes and Associates Building Works at G/F Lift Lobbies at Cho Yiu Chuen
Contract No.: N/A
Client: Hong Kong Housing Society
Construction Period: 5/08-10/08
Area: N/A

Renovation Works for Yuen Long Merchants Association House at 28 Castle Peak Road, Yuen Long
Contract No.: N/A
Client: Yuen Long Merchants Education Promotion Ltd.
Construction Period: 5/08-6/08
Area: N/A

Comprehensive Re-furbishment Works at Shortis Family at 98 Repulse Bay, Hong Kong
Contract No.: N/A
Client: Mr. James Shortis
Construction Period: 3/08-7/08
Area: N/A

Comprehensive Re-furbishment Works at 7 Moorsom Road, Jardine Lookout, Hong Kong
Contract No.: N/A
Client: Prosper Capital Ltd.
Construction Period: 12/07 – 4/08
Area: N/A

A&A Works for Carpark Entrance at L7, L8 & L8M, Enterprise Square Five, Kowloon Bay, Kowloon
Contract No.: N/A
Client: Megabox Development Company Ltd.
Construction Period: 12/07 – 1/08
Area: N/A

Pre-Sale & After-Sale Works for Cascades at 93 Chung Hau Street, Homantin, Kowloon
Contract No.: N/A
Client: Hong Kong Housing Society
Construction Period: 11/07 – 6/08
Area: N/A

Modification to Existing Parapet Railings at Residential Blocks and Podium Deck in Jat Min Chuen
Contract No.: N/A
Client: Hong Kong Housing Society
Construction Period: 11/07 -2/08
Area: N/A

Provision of Labour & Material for Supply & Installation of GMS Platform, S.S. Safety Belt Anchorage & Other Misc.Items at VentShaft at TWH, MEF, LCK, CSW & PRE Station
Contract No.: N/A
Client: MTR Corporation Ltd.
Construction Period: 10/07 – 2/08
Area: N/A

Supply & Installation og Drip Tray for Switch Rooms at Residential Blocks of Heng Fa Chuen
Contract No.: N/A
Client: MTR Corporation Ltd.
Construction Period: 9-10/07
Area: N/A

Construction of Steel Frame Structure Wall for Store Room at Internal Carpart of Centralised Science Laboratory Building in CUHK
Contract No.: N/A
Client: The Chinese University of HK
Construction Period: 8-9/07
Area: N/A

Refurbishment Works for the Re-Sale Flat Units at Verbena Heights, Tsueng Kwan O
Contract No.: N/A
Client: Hong Kong Housing Society
Construction Period: 4-8/07
Area: N/A

Fitting Out and Renovation Works to the Property Management Advisory Centre (Yuen Long District) at Shop 9, G/F, Kam Long Building, 41/59 Tai Tong Road, Yuen Long, N.T.
Contract No.: N/A
Client: Hong Kong Housing Society
Construction Period: 1/07 – 3/07
Area: N/A

Replacement of Existing Lift Emergency Access into 1 hr Fire Rated Doors at Varous Floor at Admiralty Doors Centre
Contract No.: N/A
Client: MTR Corporation Ltd.
Construction Period: 10/06-1/07
Area: N/A

Extension of Hospital Main Block, LG/F to 3/F Hong Kong Baptist Hospital
Contract No.: N/A
Client: Hong Kong Baptist Hospital
Construction Period: 9/06 – 1/08
Area: N/A

Site Formation, Piling and Substructure Works for the Extension of Hospital Block, LG/F to 3/F, Hong Kong Baptist Hospital, Kowloon
Contract No.: N/A
Client: Hong Kong Baptist Hospital
Construction Period: 9/06 – 5/07
Area: N/A

Contract C7282.27-06C Station Commercial Works for KWT, TUC, POA, CEN, MOK & HFC
Contract No.: C7282.27-06C
Client: MTR Corporation Ltd.
Construction Period: 9/06 – 4/07
Area: N/A

Proposed Residential Development at No. 155 – 161 Yee Kuk Street Sham Shui Po Kowloon
Contract No.: N/A
Client: China Overseas Property Ltd.
Construction Period: 8/06 -1/08
Area: N/A

Reinstatement of 2-storey Old Village House at 28 Castle Peak Road, Yuen Long, N.T.
Contract No.: N/A
Client: Yuen Long Merchants Association
Construction Period: 8/06 – 3/07
Area: N/A

Proposed Residential Development at No. 307 To Kwa Wan Road, Kowloon
Contract No.: N/A
Client: China Overseas Property Ltd.
Construction Period: 7/06 – 1/08
Area: N/A

Alterations and Additions Term Contract for Building Works 2006
Contract No.: N/A
Client: Hong Kong Polytechnic University
Construction Period: 7/06 – 6/08
Area: N/A

Provision of Misc. Facilities for K-Train Comporent Overhaul at Kowloon Bay Depot (Contract No. C1666)
Contract No.: N/A
Client: MTR Corporation Ltd.
Construction Period: 7/06 – 9/06
Area: N/A

Comprehesive Refurbishment Works at Flat 5D, 129 Caine Road, Hong Kong
Contract No.: N/A
Client: Gary & Tracle Co.
Construction Period: 7/06 – 9/06
Area: N/A

Improvement Works for Route Between Cyberport 1 & Shuttle Lift to Hotel (Work Order M3309)
Contract No.: N/A
Client: Cyberport Management Ltd.
Construction Period: 7-8/06
Area: N/A

Contract for Comprehensive Re-furbishment Works at House F, 12-16 Tai Tam Road, Hong Kong
Contract No.: N/A
Client: Mr. Stese Kelsey Pioneer Marrtime Co., Ltd.
Construction Period: 6/06 – 10/06
Area: N/A

Comprehensive Refurbishment Works at Flat F1, Henredon Court, 8 Shouson Hill Road, Hong Kong
Contract No.: N/A
Client: Mr. Aamir and Naazi Rahim
Construction Period: 6/06 – 9/06
Area: N/A

Installation of Fitness Equipment and Relacement of Play Equipment and Safety Matt at Tui Min Hoi Chuen
Contract No.: N/A
Client: Hong Kong Housing Society
Construction Period: 6-11/06
Area: N/A

Term Contract for Supply & Installation Safety Grilles and Handrails at Residential Flat in Hang Fa Chuen
Contract No.: N/A
Client: MTR Corporation Ltd.
Construction Period: 5/06 – 4/07
Area: N/A

Comprehensive Re-furbishment Works at House 4, Belvedere, 51 Plantation Road, the Peak
Contract No.: N/A
Client: Linfield Limited
Construction Period: 4/06 – 11/06
Area: N/A

Construction of E&M Combined Office at Tsuen Wan Depot (Contract No. C1789-06C)
Contract No.: C1789-06C
Client: MTR Corporation Ltd.
Construction Period: 4/06 – 8/06
Area: N/A

Entrance C Relocation for Tsuen Wan Station (Contract No. C4679-05C)
Contract No.: C4679-05C
Client: MTR Corporation Ltd.
Construction Period: 2/06 – 6/06
Area: N/A

Site Formation and Foundation for 85 Repulse Bay Road, Hong Kong
Contract No.: N/A
Client: Esther & Victor Limited
Construction Period: 1/06 – 5/06
Area: N/A

Proposed Garden Deck at 85 Repulse Bay Road, Hong Kong
Contract No.: N/A
Client: Esther & Victor Limited
Construction Period: 12/05 – 12/06
Area: N/A

Improvement Works for Additional Fencing along the Perimeter of Cricket Field
Contract No.: N/A
Client: Hong Kong Cricket Club
Construction Period: 10/05 – 12/05
Area: N/A

Provision of Labour & Materials for Minor Metal Works at MTR Various Stations
Contract No.: N/A
Client: MTR Corporation Ltd.
Construction Period: 10-12/05
Area: N/A

Comprehensive Re-furbishment Works at House 1, Belvedere, 51 Plantation Road, the Peak
Contract No.: N/A
Client: Linfield Limited
Construction Period: 8/05 – 1/06
Area: N/A

Alterations and Additions for School of Design at AG104 & AG117 Lecture Room and Resource Centre, the Hong Kong Polytechnic University, Hunghom
Contract No.: N/A
Client: Hong Kong Polytechnic University
Construction Period: 8/05 – 9/05
Area: N/A

Contract No. C6418-05C, Siu Ho Wan Depot Workshop Re-layout and Provision of Additional Depot Facilities
Contract No.: C6418-05C
Client: MTR Corporation Ltd.
Construction Period: 7/05-3/06
Area: N/A

Term Contract for Aluminium Window Maintenance Works of Rental Blocks in Composite Sites
Contract No.: N/A
Client: Hong Kong Housing Society
Construction Period: 7-10/05
Area: N/A

Installation Works at Coach Lanes of Land Boundary Control Point of Man Kam Tau and Sha Tau Kok (PO No. 20050712)
Contract No.: PO No. 20050712
Client: Asia Vision Technology Ltd.
Construction Period: 7-8/05
Area: N/A

Cable Installation Work for River Trade Terminal Co. Ltd., 201 Lung Mun Road, Tuen Mun (PO No. 20050629)
Contract No.: PO No. 20050712
Client: Asia Vision Technology Ltd.
Construction Period: 7-8/05
Area: N/A

Installation Work for Lok Ma Chau Inbound 4-Kisoks
Contract No.: N/A
Client: Asia Vision Technology Ltd.
Construction Period: 7-8/05
Area: N/A

Enhancement Works Garden & Interior for House 3B, Twin Bay Villa, Clearwater Bay, N.T.
Contract No.: N/A
Client: Sharen Gill
Construction Period: 7-8/05
Area: N/A

Alterations and Additions for G/F and Basement at 140-143 Austin Road
Contract No.: N/A
Client: Dr. Lo
Construction Period: 7 – 9/05
Area: N/A

Re-painting of Ferris Wheel at Headland, Ocean Park
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 7/05
Area: N/A

Rectification of Defects for Cyberport 1 to 2 (Contract No. M3265eD)
Contract No.: M3265eD
Client: Cyberport Ltd.
Construction Period: 6-9/05
Area: N/A

Comprehesive Re-furbishment & Re-roofing at Flat G&H, 3/F., 6-8 Osmauthus Road, Yau Yat Chuen
Contract No.: N/A
Client: Miao Family
Construction Period: 6 – 9/05
Area: N/A

Investigation of Water Leakage at Double Slab of Cyberport 3 (Work Order M3317)
Contract No.: Work Order M3317
Client: Cyberport Ltd.
Construction Period: 6-8/05
Area: N/A

Improvement Works for existing Storage Sheds for Hong Kong Cricket Club at Wong Nai Chung Gap Road
Contract No.: N/A
Client: Hong Kong Cricket Club Ltd.
Construction Period: 6-8/05
Area: N/A

Interior Fit-Out at Flat 7B, 23-25 Shelly Street, Central
Contract No.: N/A
Client: Mary Colleen
Construction Period: 6 – 7/05
Area: N/A

Construction of Ramp for Persons with Disablility in Healthy Village Site III
Contract No.: N/A
Client: Hong Kong Housing Society
Construction Period: 5-6/05
Area: N/A

Comprehensive Interior Fit-Outs at 3C, Pricnce Court, Prince Edward Road
Contract No.: N/A
Client: Chiu Family
Construction Period: 5 – 6/05
Area: N/A

Supply and Installation of Safety Grilles and Handrails of Residential Flats in Hang Fa Chuen (Contract No. C1988)
Contract No.: C1988
Client: MTR Corporation Ltd.
Construction Period: 4/05-3/06
Area: N/A

Repairs to Seawall at Discovery Bay Area 10B
Contract No.: N/A
Client: Hong Kong Resort Co., Limited
Construction Period: 4/05
Area: N/A

Interior Fit-Out at Flat 2G, 69 Bisney Road, Pokfulam
Contract No.: N/A
Client: Michael Chin
Construction Period: 3 – 5/05
Area: N/A

Temporary Supports for Stable 1-4, Shatin Racecourse
Contract No.: N/A
Client: Hong Kong Jockey Club
Construction Period: 3 – 4/05
Area: N/A

Enhancement Works at 53 Mt. Davis Road, Pokfulam
Contract No.: N/A
Client: Mr. Markus Jebsen
Construction Period: 2/05 – 6/05
Area: N/A

Rectification Works for External Water Feature, Las Vegas Sands, Macau
Contract No.: N/A
Client: P&A Engineering Ltd.
Construction Period: 1 – 3/05
Area: N/A

Renovation Works for Apartment 1B Twin Bay Villas, Clearwater Bay Road, Sai Kung
Contract No.: N/A
Client: Mr. Mallinson
Construction Period: 12/04-2/05
Area: N/A

Comprehesive Re-furbishment at 2/F., No. 7 Wilson Road, Jardine Lookout, Hong Kong
Contract No.: N/A
Client: Mr. Simon Clarke
Construction Period: 9-12/04
Area: N/A

Improvement Works for Net Fencings at Green Ground of Hong Kong Cricket Club, Wong Nai Chung Gap Road
Contract No.: N/A
Client: Hong Kong Cricket Club Ltd.
Construction Period: 8 – 9/04
Area: N/A

Additional and Improvement Works at Craigengower Cricket Club, 188 Wong Nai Chung Road, Happy Valley, Hong Kong
Contract No.: N/A
Client: Craigengower Cricket Club
Construction Period: 7-9/04
Area: N/A

Decoration Works at Flat F, 19/F., Winway Court 3 Tai Hang Road, Hong Kong
Contract No.: N/A
Client: Mr. Chan Yei San Rose
Construction Period: 7-9/04
Area: N/A

Proposed Residential Redevelopment at RBL 910, 29 Severn Road, The Peak, Hong Kong
Contract No.: N/A
Client: Statehart Co. Ltd.
Construction Period: 5/04-9/05
Area: N/A

Pedestrian Entrance and A&A Works Project Kam Shing Road, Kowloon
Contract No.: N/A
Client: Hong Kong Baptist University
Construction Period: 5-11/04
Area: N/A

Demolition, Hoarding and Site Investigation Work for Craigengower Cricket Club – Phase II Renovation Wokrs at 188 Wong Nai Chung Road, Hong Kong
Contract No.: N/A
Client: Craigengower Cricket Club
Construction Period: 4-7/04
Area: N/A

3-Year Term Contract for Hoarding & Film (Contract No. C1653)
Contract No.: C1653
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 4/04-3/07
Area: N/A

Design and Build of Out-Gate Lane Modification Works at CT8W for Asia Container Terminals Ltd.
Contract No.: C1653
Client: Asia Container Terminals Ltd.
Construction Period: 3/04-5/04
Area: N/A

Proposed Residence at No. 53 Mt. Davis Road, Pokfulam, Hong Kong
Contract No.: N/A
Client: Mr. Markus Jebsen
Construction Period: 8/03-1/05
Area: N/A

Site Formation and Foundation for 53 Mt. Davis Road, Pokfulam, Hong Kong
Contract No.: N/A
Client: Mr. Jebsen Markus
Construction Period: 8 – 10/03
Area: N/A

Improvement Works for Common Workshop at Chai Wan Depot, Provision of EMU Small Parts Cleaning Facility at Siu Ho Wan Depot (P.O. No. P55161)
Contract No.: PO No. P55161
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 8/03-1/04
Area: N/A

Relaying of emergency Vehicle Access Road Surfaces Fu Ning Garden, 25 Po Ning Road, Tseung Kwan O
Contract No.: N/A
Client: Funing Property Management Ltd.
Construction Period: 7-8/03
Area: N/A

Provision of Guard Rail on Top of Distribution /Rectifier Transformers (P.O. No. P52623)
Contract No.: PO No. P52623
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 6/03-12/05
Area: N/A

Renovation Works for Hok Yau Club at 12/F., Cheung Lee Building, 141 Cheung Sha Wan Road, Kowloon
Contract No.: N/A
Client: Hok Yau Club
Construction Period: 5-6/03
Area: N/A

Demolition The Existing Filtration Pump Room And Female Changing Room and Fence Wall at Craigengower Cricket Club, 188 Wong Nai Chung Road, HK
Contract No.: N/A
Client: Craigengower Cricket Club
Construction Period: 4-6/03
Area: N/A

Landscaping Works at Cyberport Promenade (Work Order No. M393)
Contract No.: Work Order M393
Client: Cyper-Port Management Ltd.
Construction Period: 1-3/04
Area: N/A

Design & Build Interior Fit-Out Works at Shop D, G/F Healthy Village Estate, North Point, Hong Kong
Contract No.: N/A
Client: Quarry Bay Baptist Church
Construction Period: 1-3/03
Area: N/A

Repairing Works to The Sink/Bench Cabinet at the Student Hostels (Phase IV)
Contract No.: N/A
Client: Lingnan University
Construction Period: 12/02
Area: N/A

Proposed Redevelopment of Craigengower Cricket Club at 188 Wong Nai Chung Road, Hong Kong
Contract No.: N/A
Client: Craigengower Cricket Club
Construction Period: 11/02-8/03
Area: N/A

Rectification of Defective External Wall Tile Finishes Package 3 (Phase 4) at the Pinnacle, Tseung Kwan O
Contract No.: N/A
Client: Hong Kong Housing Society
Construction Period: 11/02-12/03
Area: N/A

Improvement & Fitting Out Works of Residential Development at Lot 2427 DD83 Kwan Tei, Fanling
Contract No.: N/A
Client: Mark Universal Ltd.
Construction Period: 10/02-6/03
Area: N/A

Rectification of Defective External Wall Tile Finishes Package 3 (Phase 5) at The Pinnacle, Tseung Kwan O
Contract No.: N/A
Client: Hong Kong Housing Society
Construction Period: 8/02-10/03
Area: N/A

Reconditioning New Post & Fence in CWD (Purchase Order No. P39076)
Contract No.: PO No. P39076
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 8-9/02
Area: N/A

Construct Reinforced Concrete Base Slab and High Level Walking Platform & Staircase at MTR Siu Ho Wan Depot (Purchase Order No. P36079)
Contract No.: PO No. P36079
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 5-8/02
Area: N/A

A&A Work for Erection of Metal Fence Wall at Lakeside Garden, 1 Chui Tong Road, Sai Kung
Contract No.: N/A
Client: Hong Kong Housing Society
Construction Period: 4-6/02
Area: N/A

Provision of Minor Metal Works at Tung Chung Noise Enclosure (Purchase Order No. P33065)
Contract No.: PO No. P33065
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 1-3/02
Area: N/A

Racecourse Facilities Improvement 4/F & 5/F Loge at Happy Valley Racecourse at HKJC
Contract No.: N/A
Client: The Hong Kong Jockey Club
Construction Period: 1-8/02
Area: N/A

Provision of Metal Walking Platform Inside Ceiling Void for High Level Maintenance at KOW (Purchase Order No. P34190)
Contract No.: PO No. P34190
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 1-4/02
Area: N/A

Reconditioning New Post & Fence in CWD (Purchase Order No. P29702)
Contract No.: PO No. P29702
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 12/01
Area: N/A

Provide & Install New Cable troughs along Trackside at difference locations inside Kowloon Bay Depot (Purchase Order No. P29584)
Contract No.: PO No. P29584
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 11/01-12/01
Area: N/A

Supply & Installation of Hoarding at MTR Central Station (Purchase Order No. P30304)
Contract No.: PO No. P30304
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 10/01-1/02
Area: N/A

Rectification of Cracks and Defective Expansion Joins at Carpark of The Pinnacle
Contract No.: PO No. P30304
Client: Hong Kong Housing Society
Construction Period: 9/01-1/02
Area: N/A

Refurbishment Works to East & West Loading Bay of Paradise Mall and Commercial Carparks at Heng Fa Chuen (Purchase Order No. P29389)
Contract No.: PO No. P29389
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 9/01
Area: N/A

Rectification of Defective Roofing False, Ceiling Cladding and Paving of Covered Walkway and Footbridge at the Pinnacle, Tseung Kwan O, Area 24
Contract No.: N/A
Client: Hong Kong Housing Society
Construction Period: 6/01-4/02
Area: N/A

Residential Development at Lot 2427 DD83 Kwan Tei, Fanling
Contract No.: N/A
Client: Mark Universal Ltd.
Construction Period: 5/01-9/02
Area: N/A

Frog Hopper Ride at Ocean Park
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 3-4/01
Area: N/A

A&A Works at 2/F., Sun Ling Plaza, 30 On Kui Street Fanling
Contract No.: N/A
Client: New Crown Investment Ltd.
Construction Period: 3-4/01
Area: N/A

To Supply and Install Exist Doors of Fire Resistance Purpose at Madam S H Hall Student’s Hostel and Xuesi Hall Student’s Hostel
Contract No.: N/A
Client: The Chinese University of HK
Construction Period: 1-3/01
Area: N/A

Proposed Slope Retaining Wall Remedial Works at The Chinese Rhenish Church Hong Kong Synod No. 86A Bonham Road, Hong Kong
Contract No.: N/A
Client: Chinese Rhenish Church Hong Kong
Construction Period: 8/00
Area: N/A

Fire Safety Improvement, New Henry House, HK
Contract No.: N/A
Client: Henry G. Leong Estates Ltd.
Construction Period: 7-11/00
Area: N/A

Shatin Racecourse Floodlight System Improvement
Contract No.: N/A
Client: The Hong Kong Jockey Club
Construction Period: 5/00-10/00
Area: N/A

A&A works for Restaurant at Maritime Square at Tsing Yi, N.T.
Contract No.: N/A
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 12/99-3/00
Area: N/A

Term Contract for Concrete Repairing Works
Contract No.: N/A
Client: The Chinese University of HK
Construction Period: 12/99-11/00
Area: N/A

Rectificatioin Works to The Defective Wall Tiles Finishes of External Facade at The Pinnacle (Pilot Scheme)
Contract No.: N/A
Client: Hong Kong Housing Society
Construction Period: 12/99-3/00
Area: N/A

Proposed Wong Cho Tong Social Building, Sheung Shing Street, KIL 11042, Homantin, Kowloon
Contract No.: N/A
Client: Tung Wah Group of Hospitals
Construction Period: 11/99-10/00
Area: N/A

Proposed Recreational Development at S.T.T. No.1019 Tai Po Kau, N.T.
Contract No.: N/A
Client: Maple Crest Development Ltd.
Construction Period: 6/99-3/00
Area: N/A

A&A works for Southern Walkway at Maritime Square at Tsing Yi, N.T.
Contract No.: N/A
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 5/99-10/99
Area: N/A

Misc. Works Sip-back of House – NOP Advance Works Group I
Contract No.: N/A
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 5/99-10/99
Area: N/A

Contract No. R1736-98C Miscellaneous Improvement Works at KBD & TWD
Contract No.: R1736-98C
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 10/98-3/99
Area: N/A

P.O. No. 33128/98 Renovation of External Facades of Cinema and Recreation Club at Telford Gardens
Contract No.: PO No. 33128/98
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 9/98-1/99
Area: N/A

Proposed University Community Centre at Hong Kong Baptist University
Contract No.: N/A
Client: Hong Kong Baptist University
Construction Period: 8/98-1/00
Area: N/A

Contract No. C2059-98C Provision of Maintenance Enclosure for RGU at Kowloon Bay Depot at MTRC
Contract No.: C2059-98C
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 7/98-4/99
Area: N/A

Addition and Alteration Works at No. 83 Repulse Bay Road, RBL 582, Hong Kong
Contract No.: N/A
Client: Overseas Fame Industries Ltd.
Construction Period: 7-11/98
Area: N/A

Main Contract of Giant Panda Exhibit at Centenary Garden, Ocean Park, Hong Kong
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 4/98-2/99
Area: N/A

Site Formation and Mini Piling Foundation Work for Giant Panda Exhibit at Centenary Garden, Ocean Park
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 4-7/98
Area: N/A

Contract No. TO908/97C Paint Works – Term Contract (98-99)
Contract No.: TO908/97C
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 1/98-12/99
Area: N/A

Proposed Combined Home/Day Care and Social Centre for the Elderly at FSSTL 174, Area 6A, Sheung Shui
Contract No.: N/A
Client: Fung Kai Public School
Construction Period: 11/97-12/98
Area: N/A

The Hoarding Works for Residential and Recreation Development at DD35, Tai Po Kau
Contract No.: N/A
Client: Kerry Real Estate Agency Ltd.
Construction Period: 11/97-1/98
Area: N/A

Renovation Work of Commercial Carpark at Telford Gardens, Kowloon Bay, Kowloon
Contract No.: N/A
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 11/97-5/98
Area: N/A

The Extension to South Island School at 50 Nam Fung Road, Hong Kong
Contract No.: N/A
Client: English Schools Foundation
Construction Period: 7/97-7/98
Area: N/A

Superstructure Works for an Office Building at No. 25 & 27 Lock Road, Tsimshatsui, Kowloon
Contract No.: N/A
Client: Lokille Estates Ltd.
Construction Period: 6/97-5/98
Area: N/A

Construction Roadside Noise Barrier NKIL 6160, Diamond Hill, Kowloon
Contract No.: N/A
Client: Wheelock Properties Ltd.
Construction Period: 6/97-1/98
Area: N/A

Term Contract for Alteration Works to Bldg., (1st May 1997 – 30th April 1998) in CUHK
Contract No.: N/A
Client: The Chinese University of HK
Construction Period: 5/97-4/98
Area: N/A

Repairs of Spelled Concrete on External Wall and Cantilevered Roof Canopy
Contract No.: N/A
Client: The Chinese University of HK
Construction Period: 5-7/97
Area: N/A

Renovation for The HK Council of Social Service at 15 Hennessy Road, Wanchai, HK
Contract No.: N/A
Client: The HK Council of Social Service
Construction Period: 2-6/97
Area: N/A

Contract No. R4158/96C Retiling of Entrances, Staircases and Floors in Various Stations
Contract No.: R4158/96C
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 11/96-6/97
Area: N/A

Construction of Discovery of Ancient World at Lowland, Ocean Park
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 10/96-4/97
Area: N/A

Site Formation Works for Discovery of Ancient World at Lowland, Ocean Park
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 10/96-4/97
Area: N/A

The New Science Building Complex in The Chinese University Campus, Shatin
Contract No.: N/A
Client: The Chinese University of HK
Construction Period: 5/96-8/98
Area: N/A

Erection of Hoarding and Covered Walkway for Headquarters of HK Academy of Medicine at Wong Chuk Hang, Hong Kong
Contract No.: N/A
Client: HK Academy of Medicine
Construction Period: 4-5/96
Area: N/A

Erection of Hoarding and Covered Walkway for Headquarters of HK Academy of Medicine at Wong Chuk Hang, Hong Kong
Contract No.: N/A
Client: HK Academy of Medicine
Construction Period: 4-5/96
Area: N/A

Contract No. TO908/95C Painting Term Contract (96-97)
Contract No.: TO908/95C
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 1/96-12/97
Area: N/A

Penthouse Renovation at New Henry House, Central
Contract No.: N/A
Client: Henry G. Leong Estates Ltd.
Construction Period: 11/95-2/96
Area: N/A

Demolition of Structure for Existing Building Extension at 12-12F Smithfield Road
Contract No.: N/A
Client: Lucky Hero Investment Ltd.
Construction Period: 10/95-1/96
Area: N/A

Construction of Additional 24/F & 25/F., at 12F-12G Smithfield Road, Hong Kong
Contract No.: N/A
Client: Lucky Hero Investment Ltd.
Construction Period: 10/95-1/96
Area: N/A

Construction of Simulator Ride at Lowland, Ocean Park
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 9/95-4/96
Area: N/A

Upgrading of Facilities & Stage Engineering System, Shaw Lecture Theatre
Contract No.: N/A
Client: The Chinese University of HK
Construction Period: 9-11/95
Area: N/A

Contract No. C2047/95C, Provision of Pressurized Tunnel Cleansing System for SKM and KOT Station (Trial)
Contract No.: C2047/95C
Client: Mass Transit Railway Corporation Ltd.
Construction Period: 9/95-3/96
Area: N/A

Conversion to Ozone Sterilisation System for Public Swimming Pool in N.T. (Contract No. FID 315)
Contract No.: FID 315
Client: J/V with P&A Engineering Ltd. for HK Government
Construction Period: 8/95-4/96
Area: N/A

Demolition of Existing Single Storey Building and Mini-piles Work for the Project of Conversion to Ozone Sterilisation System for RC Phase II
Contract No.: N/A
Client: Hong Kong Government
Construction Period: 8/95-4/96
Area: N/A

The Superstructure of a Private Residence at RBL 583, 85 Repulse Bay Road, HK
Contract No.: N/A
Client: Esther & Victor Limited
Construction Period: 7/95-3/96
Area: N/A

Construction of Toto the Loco Ride at Lowland, Ocean Park
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 6/95-11/95
Area: N/A

Renovation Works at Li Dak Sum Building
Contract No.: N/A
Client: The Chinese University of HK
Construction Period: 4-8/95
Area: N/A

Construction of External Seating Areas at Lowland, Ocean Park
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 2-3/95
Area: N/A

Conversion to Ozone Sterilisation System for Swimming Pool in N.T. (Contract No. FIC 325)
Contract No.: FIC 325
Client: J/V with P&A Engineering Ltd. for HK Government
Construction Period: 11/94-4/95
Area: N/A

Demolition of Existing Single Storey Building for the Project of Conversion to Ozone Sterilisation System for RC Phase I
Contract No.: N/A
Client: Hong Kong Government
Construction Period: 11/94-4/95
Area: N/A

Term Contract of Painting Works, CUHK
Contract No.: N/A
Client: The Chinese University of HK
Construction Period: 9/94-8/95
Area: N/A

Super-structural Works at F.S.S. Town Lot #165 at On Kui Street, Fanling, N.T.
Contract No.: N/A
Client: New Crown Investment Ltd.
Construction Period: 7/94-3/95
Area: N/A

Tour Bus Stations, Commissary & Warehouse Project at Ocean Park
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 7/94-1/95
Area: N/A

Addition & Alternation Works to Science Centre in CUHK
Contract No.: N/A
Client: The Chinese University of HK
Construction Period: 7/94-3/95
Area: N/A

Dinosaur Exhibit Project at Ocean Park
Contract No.: N/A
Client: Ocean Park Corporation
Construction Period: 7/94-1/95
Area: N/A

Replacement of Windproof Baffle Ceiling at Podium Level 2 and Suspended Ceiling at Podium Level 2 Lobby of Block 3 in Bo Shek Mansion (20002/BSM) (B/20200216/BSM)
Contract No.: B/20200216/BSM
Client: Hong Kong Housing Society
Construction Period: Nov-22 – Dec-25
Area: N/A