Contract No.:
Client:
Construction Period:
Area:
N/A
Bright Port Holdings Limited
12/12 – 3/14
N/A
Contract No.:
N/A
Client:
Bright Port Holdings Limited
Construction Period:
12/12 – 3/14
Area:
N/A
Proposed Industrial Development at 313-317 Castle Peak Road, Kwai Chung – D.D. 445 Lot 693 s.E.