Repairing Works to The Sink/Bench Cabinet at the Student Hostels (Phase IV)

Contract No.:

Client:

Construction Period:

Area:

N/A

Lingnan University

12/02

N/A

Contract No.:

N/A

Client:

Lingnan University

Construction Period:

12/02

Area:

N/A

Repairing Works to The Sink/Bench Cabinet at the Student Hostels (Phase IV)

Tags

What do you think?