Replacement of Existing Air Conditioning System with New Daikin VRV System for House 6, The Belvedere, 51-61 Plantation Road, the Peak, Hong Kong

Contract No.:

Client:

Construction Period:

Area:

N/A

Linfield Limited

7/10 – 9/10

N/A

Contract No.:

N/A

Client:

Linfield Limited

Construction Period:

7/10 – 9/10

Area:

N/A

Replacement of Existing Air Conditioning System with New Daikin VRV System for House 6, The Belvedere, 51-61 Plantation Road, the Peak, Hong Kong

Tags

What do you think?